What this work involves
List equipment, lighting and controls per room. Coordinate routes with structure and finishes. Use professionals appropriate to the installation.
- Existing system survey
- Capacity and points
- Safe accessible routes
- Kitchen, bathroom and heating coordination
- Testing, records and explanation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Create an element register with dimensions, condition and intended treatment.
What the drawing needs to explain
Prepare a detail sheet for the door, frame, skirting and wall together. Identify retained elements, refinished surfaces and locations requiring bespoke work.
Decide this before construction
Dismantle retained elements only with an agreed recording and storage plan. Take final bespoke measurements after assessing the adjoining substrate.
Compare the complete intervention
Separate retention, repair and new bespoke work in the quotation. This shows the preparation and protection effort alongside the visible end result.
Cost factors for this service
Scope, access and replacement requirements determine the budget.
Bring this to the discussion
Plans showing equipment and points, with existing system information.
Questions about the work
When should connection points be final?
Preferably before walls and floors close. A room plan with furniture and equipment reduces later cutting and repair.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

